banner_yel_text
NavLeft02

(Previous Case Study)

NavUp02

(Back to Softwall Cleanrooms)

NavRight02

(Next Case Study)

Softwall with Workstations

A contract manufacturing company needed a clean environment for assembly of electronic parts. The final assembly of the parts is completed inside a Class 100 workstation that is within a Class 100,000 softwall cleanroom. The area outside the softwall room is a general manufacturing environment. Installation was completed in one day.

Softwall with Workstations

Copyright © 2004-2007 Contamination Solutions, Inc. All rights reserved.
[home] [about us] [cleanrooms] [services] [pharmacy-labs] [air filtration] [contact us] [modular cleanrooms] [softwall cleanrooms] [cleanroom components] [chapter 797 audit service] [iso cleanroom audit service] [particle counts service] [laminar flow workstations] [pharmacy-lab biosafety] [barrier isolator] [ashrae air filtration] [hepa air filtration] [carbon air filtration] [air filtration housings]