Our customer required a Class 10,000 QC lab to be built near the manufacturing process. At the same time, space for engineering offices was also being sought. With space at a premium, we suggested locating the offices above the lab. A plenum for air distribution and filtration was created between the ceiling of the lab and the floor of the offices. The project was completed in five days after receiving materials on site.